Haxton Turbo | CREATE A NEW OR RE-ARRANGE THE OLD
258
home,page-template,page-template-full_width,page-template-full_width-php,page,page-id-258,ajax_fade,page_not_loaded,,qode-title-hidden,qode_grid_1400,footer_responsive_adv,qode-content-sidebar-responsive,qode-theme-ver-16.8,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-5.5.2,vc_responsive

HAXTON TURBO

“Create a new or re-arrange the old”

Icon1

Safety in Action

Safety in Action is a directive that defines who we are as a company and guides our approach to the environment, health, and safety.

Icon2

Quality

Haxton Turbo manufacturing operations in the Malaysia maintain quality management systems in accordance with the ISO standard.

Icon3

Concern

Concern for others is at the Haxton Turbo activities. We actively support community, regional, and national organizations

ABOUT HAXTON-TURBO

Haxton Turbo was founded by our chairman and founder, En. Mohammad Irfan after he decided to resign from Petronas Gas Bhd with a decade of experiences in Utility Industry to explore more opportunities by being innovative to discover the future possibilities to provide improvement and advancement with technologies to our clients. Haxton focuses on accessibility, innovations,new designs and quality on our products and services provided to satisfy our clients’ needs.

WORKSHOP FACILITIES

Dedicated turbo machinery workshops situated in Kuantan Pahang Malaysia.

FIELD SERVICES

Flexible and responsive field team fully equipped to support your assets.

PARTS SUPPORT

Ability to manage all of your part requirements, applying OEM standards & practices.

EXISTING PROJECTS

VENTURI INJECTION SYSTEM FOR CLOSE LOOP COOLING WATER GE FRAME 6B.

COORPERATE WITH PETRONAS GAS BHD.

To custom design, fabricate, install and commissioning new electrical-free system of close loop cooling water chemical injection system for 6 Train GE Frame 6B Gas turbine at utilities Kerteh (on-going)

To custom design, fabricate, install and commissioning new electrical-free system of close loop cooling water chemical injection system for 6 Train GE Frame 6B Gas turbine at utilities Kerteh (on-going)